Installation
Installers and substrates
We advise professional installation - Kandes is an architectural panel, not a DIY product.
- Specialist tradeFor most projects, a drywall or plastering contractor.
- Suitable substrates
- plasterboard · plaster · concrete · primed wood
MDF, chipboard, laminated or painted surfaces: only with an adhesive selected for them.
Seven steps
- Acclimatise24 h on site, upright, in the packaging. Never flat.
- Prepare the wallClean, dry, level (max 1 mm per 1 m), load-bearing, primed.
- Plan the layout5 mm perimeter gap; dry-fit; start at the bottom row.
- Apply adhesiveGypsum adhesive full-surface, 5 mm, notched trowel, wall and panel back. Never spots or strips.
- Press and alignEven joint 1.5 to 3 mm; wipe off excess adhesive.
- Fill and sandAfter at least 24 h: soft joint filler (not adhesive); sand with grit 600.
- Prime and paintPrime the whole surface, then paint; a spray gun gives the best result.
AQUA, CURVE and TRINITY have their own instructions.
Watch it, step by step
Panels without LED, step by step, in your language.
Plays from YouTube (Google). Tapping loads the video and sends your IP address to Google. Privacy policy
